Friday, 12 October 2012

AGM

The AGM had come and gone. KTR had a new committee. Congratulation to the following.

Mr. Nadesan - Chairman
Miss Wong - Secretary
Mr. Leong - Teasurer
Mr. Leong Yue Mun - Committee Member
Mrs. Chiam - Committee Member
Dr. Selva - Committee Member
Mr. Thomas Chan - Committee Member
Mr. Vincent Owi - Committee Member

Wednesday, 15 August 2012

JMC Doing A Good Job

Since the beginning of 2012, the Joint Management Committee (JMC) had done a lot of maintenance works to keep the Kuantan Tembeling Resort (KTR) in good condition and to prevent any facilities/equipments from breakdown. Listed below are some of the more important works completed.

1) Purchased and replaced PCB Card and thyrisor module for Lift No. 5 in Block E.
              Cost - RM14,017.17
2) Replaced 2HP pump at Pump House (near to guard house)
              Cost - RM4,648.50
3) Setting and Calibration of all (10 units) electrical Master Switch Boards (MSB)
              Cost - RM3,800.00
4) Replaced damaged fountain pump at swimming pool
              Cost - RM1,530.00
5 Repaired water leakage at Electrical Switch Box of Block E & F
              Cost - RM1,100.00
6) Repaired water leakage at  Riser Telephone Cables of Block B, C & D
              Cost - RM4,300.00
7) Cleaned 3nos. water tanks at Block B
              Cost - RM2,300.00

The following works are approved by JMC and contractors are told to do the works ASAP.

1) Repair/replace collapsed fencing near Block D
              Cost - 1,400.00
2) Supply and replace gear oil for all lifts (Block A-F)
              Cost - 4,800.00
3) Supply and replace lift landing door jamb for lifts
              Cost - 3,240.00

The following works are awaiting for approval.

1) Replace Jacuzzi pump
               Estimate Cost - RM5,000.00
2) Supply and replace Car Locking device for all lifts
               Estimate Cost - RM15,600.00
3) To replace Shower and stand at swimming pool
               Estimate Cost - RM 2,500.00

The following works are in the planning stage.

1) Repainting KTR
2) Replacing the balance of all rusted iron railing
3) Installation of CCTV
4) Replace all lifts

The JMC is doing a good job and I am sure with everybody (owners & tenants) support (moral and financial) JMC will continue to do a good job.



Friday, 10 August 2012

Beautiful Day At KTR

Yesterday (9 Aug 2012) around 4.00p.m. during my usual walkabout, I cannot resist talking some photos on a beautiful day. 
The photos were taken around Block E & F.




























From time to time I hope my photos will get people informed above our resort.

Have a nice day.

Thank you.


Thursday, 9 August 2012

The Swimming Pool

Look at the swimming pool. The water is crystal clear. The photo below was taken yesterday (08 Aug 2012) morning.


It is money well spent. I understand the cost of changing the filtration system to sand filter was slightly over RM20,000.00. You can see the new sand filter below.


In my opinion, the swimming pool is image setting and it is very important to maintain the swimming pool to the highest standard.

Have a nice day at the pool.

Thank you.